Gold and Silver Wear Parts
Equipment, Parts and Materials by Production Process

Select equipment and wear parts to view product information and applicable operating conditions.

Gyratory CrusherJaw CrushersCone CrushersSAG MillBall MillsHigh Pressure Grinding RollsSlurry PumpHydrocyclone
Production Processes and Wear

Gold and silver processing lines and wear points

Explore equipment and wear parts by material characteristics, process stage and wear location.

The gold processing route depends on how the gold occurs in the ore:

Exposed native gold of suitable size may use gravity recovery and conventional cyanidation. Gold associated with sulphides may require flotation followed by concentrate or whole-ore cyanidation. Gold enclosed in pyrite or arsenopyrite may need pressure oxidation, roasting or bio-oxidation before leaching. Low-grade oxidized ore may use crushing and heap leaching. Copper-bearing gold ore requires assessment of cyanide consumption and copper-gold concentrate routes. Silver-lead-zinc ores generally require selective flotation rather than a standard gold CIL flowsheet.

Wear-part requirements can therefore extend from crushing and grinding to cyanide slurry, activated-carbon handling, acidic pressure oxidation, high-temperature roasting and heap-leach solution systems.

Equipment and Wear Parts

Equipment for gold and silver processing

View the equipment and key wear parts used in this production route.

Share your gold or silver flowsheet and process stage for an itemized quotation

Specify the process route (gyratory crushing–SAG / HPGR / underground block caving / heap leaching) and the relevant process stage. Engineers use the selection matrix to assess materials, service life limitations and drawings:

Process RouteEquipment Brand and ModelSerial Number / Model Details or DrawingOre Abrasion Index · UCS · QuartzCurrent MaterialPhotographs of Failed PartsTarget Service Life
Request a Quote

Or contact us directly: +86 156 3797 3199
zzx@anranst.com

Manufacturing Services in China

From Technical Assessment to Finished-Part Delivery

ANRANST provides customers worldwide with engineering assessment, production at certified foundries to the customer technical requirements, quality control and finished-part delivery for custom wear parts and industrial spares, with scope to support other custom industrial parts.

01

Drawing and Engineering Review

We review mating surfaces and interface dimensions and assess material, heat treatment and manufacturing feasibility.

02

Material and Heat-Treatment Specification

Material grades and heat-treatment processes are specified order by order, stated in the technical agreement and tracked through production.

03

Quality Control

Drawing confirmation, material and process control, production tracking, inspection and acceptance coordination.

04

Finished-Part Delivery

We coordinate manufacturing, quality confirmation, packaging and delivery of complete finished parts in a workable, closed-loop supply process.

Provide the equipment brand, complete model and serial number, part name, part number or drawing number, drawing revision, quantity, material requirements and duty. If identifiers are unavailable, send photographs and key dimensions.

Submit an Enquiry