Komatsu PC Hydraulic Mining Shovels: Models and Spare Parts

PC2000 / PC9000 — / — Coverage PC - PC Hydraulic Mining Shovels; or reversed, Configuration, as well with the repellent packagings and work equipment. Travel and hydraulic system Identification

Komatsu PC2000-11 Hydraulic Mining Shovels Original factory open product diagram
PC2000-11 Original factory open product diagrams; used Identification Re-soil work equipment, hydraulic cylinder, Cars to the car and backrest.
Komatsu PC5500-11 Hydraulic Mining Shovels Original factory opens picture
PC5500-11 The original factory opens the site map; displays large working devices, power modules and revolving platforms Travel institutions.
Komatsu PC9000-12 Hydraulic Mining Shovels Original factory opens picture
PC9000-12 The original factory's open-site plot; used Identification Super Large Series Shooters, armpits and cylinder wheels.
OEM Equipment Details

First, distinguish between hydraulic mine digging and steel wire rope electric spooning. model and installation position Confirmation parts

The PC series is driven by hydraulic pumps, valves and cylinder wheels. It can be configured for a straight or reverse blade of the engine; this differed from P&H wire rope lifting rod to push gear with motor drive as well. PartS confirm that complete models must also lock in full numbers (number), configuration & location aggregated units at once

7 Current Official Core model
202–896 t Open-scale workload
12–49 m³ Open scrawl capacity range
12 Wear Parts and Key Spare Part Categories
Standard Models and Key Dimensions

Komatsu PC Hydraulic Mining Shovels Standard Models and Key Parameters

Tables in model And the parameters come from Komatsu Current Official List model Pages for use Installation Identification and spare parts Range of first sieve.

Standard ModelsWeight of Open WorkAboul capacityrated power
PC2000-11201.9–207.3 t12.0–13.7 m³780 kW
PC3000-11250–261 t15–16 m³940 kW
PC4000-11393–409 t22 m³1,400 kW
PC5500-11533–552 t29 m³2 × 940 kW
PC7000-11678–699 t38 m³2 × 1,250 kW
PC8000-11752–773 t42 m³2 × 1,500 kW
PC9000-12884–896 t46–49 m³2 × 1,678 kW

The working weight and scaffold capacity vary with the straight/back, legume size of a chassis or selection configuration; it is officially recognized that complete model needs to be provided for serial number as well in driving mode. Work devices are required by drawing numbers (or old key dimensions).

Wear Parts

scattering, wear-resistant packaging and track ground wear parts

Komatsu — The original factory public information confirms that the PC series can configure hopper wear pack according to operating conditions and provide Kprime dental linen with mine track plate. In addition, a single photo from general hydraulic mining parts library is used only for category identification without Comatsu OEM interchange.

Hydraulic Mining Shovels scattering bucket teeth Category: Same parts Identification Figures
01

scattering bucket teeth

Bucket Teeth / Kprime Tooth System

The scaffold is located at the front end of a bucket, which handled material cutting and high impact as well with an Abrasive wear. A plot for partial category identification; formal confirmation was required to check PC models or recoiling gearings (or reversals), cone specifications/dental designs & lockers items etc

Material Selection: Candidates for high strength and wear resistance Alloy Cast Steel; toothed and materials Must be based on rock Hardness, block size and impact/abrasion ratio failure Ways to choose.

Entrance bucket teeth Unified Parts Page
Hydraulic Mining Shovels bucket teeth tooth adapter Category: Same parts Identification Figures
02

tooth adapter hoods and lockers

Tooth Adapters, Wear Caps & Locks

The dental adapter carries the bucket teeth load into its lips, and protects a high grinding area for your head restraint. It is necessary to set up an array of matching surfaces with bowel gear systems in order that it can be replaced by joint-facing skin masked holes or mounted lines as well AS wear limits on their jawbone system (the brush).

Material Selection: tooth adapter Reconciliation of shock resistance, fatigue and welding or assembly requirements; locking parts Materials and heat treatment Template: Original Construction It is not only a sham of the shape.

Entrance tooth adapter Unified Parts Page
Hydraulic Mining Shovels The lip and bottom of the hoisting block is similar parts Identification Figures
03

Lip sliding, side-cutting and edge board

Lip Shrouds, Side Shrouds & Cutting Edges

The high wear area near the lip, side and cutting edges is required to match size of a bucket with its number on it; right-hand position. Interface: hole level - thickness as well AS pairing between Bucket teeth & dental adapter by type for an incisor category

Material Selection: High-impact areas prioritize high resilience Alloy Cast Steel; Replaceable blade boards and local protection plates accessible Quenched and Tempered Wear Plate The route, eventually. Construction OK, for sure.

Entering the lipsticks of a single page
Komatsu Hydraulic Mining Shovels The grinding and re-ingering of the wearable packaging factory open picture
04

Bottle and wearable bags

Bucket Liners & Wear Packages

The substrate, side boards and backboarding are protected by the shovel or reverse structure.The original factory allows for abrasion pack configuration according to operating conditions; manufacturing requires plate location diagram of sheet thicknesses in order with pores as well AS welding boundaries

Material Selection: The welded steel plate is the main candidate route; impact concentration of corners and connections requires reducing risk for only pursuit hardness, as well to check welding with structural constraints.

Entrance Bucket Liners Unified Pages
Hydraulic Mining Shovels scattering Bucket Back Shroud / Wear Package Category: Same parts Identification Figures
05

Back, sidewall and bottom protection

Back, Side & Bottom Protection

External boards and pad blocks protect the shell from dragging, brushing ore impacts. The rear of a bucket is matched by an wearable map to avoid mismatch with its backbone on side walls at bottom as well in front/back position respectively for both sides' names (or right).

Material Selection: The flat-screen pad can be from Quenched and Tempered Wear Plate Introduction, large sling blocks can enter from wear-resistant alloy casting; the connection form and welding seam together determine a solution.

Entrance Bucket Back Shroud / Wear Package Unified Pages
Hydraulic Mining Shovels Track Shoes Category: Same parts Identification Figures
06

Track Shoes Grounds with the chassis

Mining Track Shoes & Undercarriage Wear Parts

The track plate is equipped with a full load, ground impact and ore wear as well. It also works in conjunction to drive sprocket (wheel bearing), wheel railing wheels(role) of the tractor-trailer engine for steering gear; it requires alignment between distance ratio width range from diameter through length ranging angle across its surface area by size up towards height within radius over time interval:

Material Selection: Candidates are high Wear-Resistant Cast Steel (a) the main part must be determined according to load, ground conditions and fracture location as well for wear distribution; heat treatment and test requirements.

Entrance Track Shoes Unified Parts Page
Spare Parts

Workplaces, revolving devices Travel With hydraulic cores spare parts

The core spare parts are organized in the aggregate position. A shovel and a reverse, different PC models as well AS diesel/electric drive configuration cannot be interchanged only by part name; interfaces must match pressure to geoar parameters for each other'S use of equipment such that they can also provide complete installation information with complimentary data on their application or requesting them from any manufacturer whose suppliers may not have been able either through an interconnection process (such is one which will allow you)

Komatsu PC2000 Operating Devices pins bushings installation position Original Factory Public Picture
01

pins, bushings Connected to the earbud

Pins, Bushings & Joint Supports

The arm, pole and the drum hinges are made up of large diameter pins (pinns), boomings(bushing) or stop-button parts. A specific point is required to provide a precise level for its bearing height; length: lube borehole - lock structure with seat holes as well in wear volume

Material Selection: Pins are checked according to the modal alloy steel and surface reinforcement route; Bushing'S bearing copper, stainless carbide or original structure is checkable with matching & Lubrication more critical than single hardness.

Entrance Bearings and Bushes Unified Pages
Komatsu PC5500 Armored poles and drillers hydraulic cylinder Original Factory Public Picture
02

Arms, pole and drill hydraulic cylinder

Boom, Arm & Bucket Cylinders

The working device hydraulic cylinder contains the drum, a sticker and an incisor system. It is required to check by either positive or reversed blades positioning of its valve diameter; italics point angle: end interface with pressure rating

Material Selection: Pistortic rods, cylinder and end forkpiece by strength or surface Quality and fatigue requirements confirmed; seals are selected according to pressure, temperature / media & pollution grade.

Entering a single sheet of seal and hydraulics -
Komatsu PC9000 Return platform and reversal bearing location original factory open picture
03

Turnback girth gear, Turnback pinion With the decelerator

Slew Ring, Swing Pinions & Gearboxes

The car is driven by the rotary motor and planetary gear reducer to a large external dental rotation bearing. It requires matching of model, number teeth or modulus with pressure anglers (or) holes in circles such as roller railings for acceleration & lamination systems

Material Selection: Turnback girth gear, pinion and the shafts are heavy load Alloy Steels for Drive Parts, toothed face heat treatment, Roller Performance and Fatigue service life Routes confirmed.

Entrance Gears and Pinions Unified Pages
Komatsu PC9000 Track chassis and Travel Power Transmission Original factory open real-world map
04

Travel Drive, at last. Power Transmission and Drive Sprocket

Travel Motors, Final Drives & Sprockets

The left-hand hydraulic motor is driven by the planetary end drive sprocket, with a track and steering wheel. A set of checkout interface for engines (planetary level), output shaft or Sproketo tooth shape shall be required; spacing will also allow it bearing in place as well than sealing on its surface.

Material Selection: gear, output shafts and sprocket by Alloy Steels for Drive Parts and surface reinforcement route confirmation; Housing, bearing The seal and the sealed check are carried, lubricated or polluted respectively.

Entering heavy Power Transmission Part / Assembly Pages -
Komatsu PC9000 Hydraulic Mining Shovels Original factory open work diagram
05

Main pumps, valves and hydraulic ducting Part / Assembly

Main Pumps, Valve Blocks & Hydraulic Modules

The main pump, control valves and rotary motor as well the cooling filter system form a core of equipment power. RFQ provides modelling methods for driving processes to pumps or flaps namesplate interface with pressure flow records on pollution failure files

Material Selection: Precision hydraulic parts are first of all with original interface, tolerances and surface quality; shells casing material can not be separated from the complete aggregate requirement.

Entering heavy Power Transmission Part / Assembly Pages -
Komatsu PC9000 Hydraulic Mining Shovels Matching the original factory's open-site map with a mine card
06

Main drive, splitting and couplings

Prime Drive, Gearbox & Couplings

Diesel or electric motors are supplied by the main drive and separation of bodies to multiple hydraulic pumps, which vary according with PC model as well in install version. The engine/motor cordboxes need a check-up between engines (gear boxes), couplingrs - pump sets; base interface is required

Material Selection: The transmission shaft, Gear and couplings are confirmed by alloy steel / heat treatment (FSH), dynamic balance of the rotor valve or torque & fatigue service life; large shells were recognized as casting quality requirements for NDT.

Entering heavy Power Transmission Part / Assembly Pages -

Komatsu PC Hydraulic Mining and Ducking P & H Wireless wire ropes spare parts Can I mix?

The PC series relies on hydraulic pumps, valves and cylinder wheels to drive the back-up motor; P&H wire rope electric shockers use booster stringing systems such as coiled roller bearing machines or push pressure gear. Even if a becca teeth are identical with its name for sticky boardes (or Gear), it must be matchable separately in structure & interface."

Only know PC7000 or PC8000 model Is Enough quotation ?

Insufficient. Serial number, shovel or reverse rollout; diesel engine and electric drive); part assembly of parts in the building block (drawing numbers) nor directory code(s), photos from used pieces with key dimensions to installation orientation as well for practical operating conditions are also required

Why the page is not unconfirmed Komatsu OEM Part Number ?

This page contains only numbers supported by traceable catalogues, drawings or installments. Before reliable evidence is obtained no real drawing number and spare parts are replaced with automatic generation of numerical codes (or similar model numerals).

Submission Komatsu PC model, Configuration, drawing number or old information

Please provide complete model with serial number, shovel/repel and drive configurations; the aggregate of parts in which they are located: drawing numbers or catalog names. Photo from used pieces (key sizes), available materials as well for operating conditions on minerals).ANRANST can perform technical consulting services to deliver supplier connections quality control & finished-part delivery

Manufacturing Services in China

From Technical Assessment to Finished-Part Delivery

ANRANST provides customers worldwide with coordinated consulting, supplier sourcing, quality control and finished-part delivery for custom parts, wear parts and industrial spares from China, with scope to support other custom industrial parts.

01

Technical Advice

Equipment and part identification, drawing review, material selection and manufacturing feasibility assessment.

02

Supplier Introductions

Match requirements with suitable manufacturers in China and coordinate the exchange of technical information.

03

Quality Control

Drawing confirmation, material and process control, production tracking, inspection and acceptance coordination.

04

Finished-Part Delivery

Coordinate manufacturing, quality confirmation, packaging and delivery of complete finished parts.

Provide the existing model, drawings, drawing or part numbers, materials or operating conditions so we can identify the appropriate technical review and supply route.

Submit an Enquiry