| Double wound rotor motor | Each mill in this factory has dual 3000hp and 13200V drives |
| Transmission reducer | Between motor and pinion |
| Transmission pinion | Reducer to large ring gear |
| Large ring gear in the middle of the cylinder | Surrounding the middle of the cylinder |
| 72 rows of lining plates and lifting bars | Barrel lining; alternating plates and lifting strips |
| Wedge between lining plates | Between rows in the barrel; materials and dimensions not specified |
| Internal and external discharge grate plate | Discharging end; inner 5/16in and outer 3/4in slotting |
| Discharge drum screen and two return ports | Mill discharge, screen +3/8in returns from two ports |
| 3in and 4in forged steel additional grinding balls | The factory changed it to semi-autogenous grinding, diameter 3in/4in, ratio 70%/30% |
| Hollow shaft lubrication system (back pressure observation) | The factory's hollow shaft is lubricated; back pressure is used as a load observation quantity, and the sensing element type is not documented |
| Analog power recorder/controller (mine plant installation) | Mill load monitoring; cannot automatically control at constant set points for each ore type |
| Sound monitor (mine factory installation) | Monitoring of each mill; combined with power/back pressure for manual control |
| ALS test SAG shell hatch | Easy to clear out the charge; shell hatch, quantity/opening mechanism not included |
| ALS test SAG load cell | Mill support weighing monitoring, quantity/installation structure not documented |
| ALS trial SAG SCADA monitoring system | Collect mill quality, power, motor current, sprocket torque and speed; on-site monitoring support |
| ALS test SAG steel lining | 6ft×2ft test mill internal lining |
| ALS test SAG discharge grid | Nominal 10mm grate size; no extrapolation of historical grinding holes |
| ALS test SAG pulp discharge lifting plate | conventional hockey stick pulp lifters; quantity/thickness not specified |
| ALS test SAG optional external discharge grating plate | Can form 2 or 4 75mm stone ports, the plan does not choose to configure the whole machine to coexist |
| ALS test SAG feed chute | 450mm, ROM or prepared drill core test material |
| ALS test SAG transmission sprocket | Main text drive chain sprocket torque monitoring object; no push chain specifications, number of teeth/reducer |
| ALS test SAG classification tower | Laboratory mill system integration package, non-cylinder BOM or approved Hardinge manufacturing parts |
| ALS test SAG feeding and discharging conveying system | Laboratory feed/discharge conveyor system, specific number/type/manufacturer not specified |