Metso TankCell flotation cell and FloatForce rotor-stator design
TankCell tank and FloatForce mixing-mechanism design for identifying the rotor, stator and bottom wear areas.
Metso flotation cell mixing mechanism and maintenance area
In-tank mixing mechanism and surrounding structures for checking shafts, rotor and stator, bottom parts and maintenance interfaces.
Metso flotation level control and dart valve arrangement
Flotation-cell level control and Dart Valve arrangement for identifying valve bodies, actuators and wear-part positions.
خط إنتاج المعدات الأصلية الذي يصنع هذا النوع من المعدات

Identify Spares by Cell Volume and Mixing-Mechanism Version

The label “flotation machine” alone is insufficient for matching parts. Begin with the series, effective volume, mixing-mechanism version and drawing revision, then review wear parts, drives, controls and materials.

5–630 m³ TankCell Standard Volume Range
13 TankCell Standard Models
0.5–38 m³ OK Cell Volume Range
FloatForce+ Core Mixing Mechanism
سلسلة المعدات

Metso Flotation المعدات Identification Scope

Tank design, mixing mechanisms, level controls and spare-part interfaces differ between series. Establish the series before requesting a quotation.

سلسلة المعدات Core Scope Key Spare-Part Identification Areas
TankCell 5–630 m³;e5–e630 FloatForce/FloatForce+, bottom wear parts, drive shafts, Dart Valve and tank protection
Conventional OK Cell 0.5–38 m³ Mixing mechanisms, shafts, tank linings, air-flow and level-control spares
Concorde Cell Flotation equipment for fine and complex ores Jet/aeration systems, tank internals, valves and wear protection
ColumnCell Flotation column series Feed, bubble generation, wash-water, discharge and tank-protection parts
SkimAir Flash flotation in grinding circuits Mixing mechanisms, feed/discharge, tank wear areas and controls
RCS Historical and operating mechanical-agitation series Rotors and stators, shafts, drives, tank linings and level controls
Models and key specifications

TankCell e Series Standard Models

The table lists the effective volume, drive type and standard installed power needed for spare-part identification.

Standard Model Effective Volume Drive Type Standard Installed Power
TankCell e5 5 m³ V-belt drive 11 kW
TankCell e10 10 m³ V-belt drive 22 kW
TankCell e20 20 m³ V-belt drive 37 kW
TankCell e30 30 m³ V-belt drive 45 kW
TankCell e50 50 m³ V-belt drive 55 kW
TankCell e70 70 m³ V-belt drive 75 kW
TankCell e100 100 m³ V-belt / gear drive 110 kW
TankCell e130 130 m³ V-belt / gear drive 132 kW
TankCell e160 160 m³ Gear drive 160 kW
TankCell e200 200 m³ Gear drive 185 kW
TankCell e300 300 m³ Gear drive 250 kW
TankCell e500 500 m³ Gear drive 400 kW
TankCell e630 630 m³ Gear drive 500 kW

Model and volume are only the first identification step. Before manufacture, verify mixing-mechanism generation, shaft interfaces, drawing reference, covering design, tank configuration and drawing revision.

Wear parts

FloatForce Mixing Mechanisms and Tank Wear Protection

ظروف التشغيل, candidate materials and general component links are organised by wear location. The equipment model, mixing-mechanism version and drawings determine the specific design.

Once the series, effective volume, mixing-mechanism version, position, drawing reference or current-part photographs are supplied, verified OEM drawing and part numbers can be assigned to the relevant cards.

Spare parts

Drive, Shaft, Level-Control and Structural Spares

Identify drive and control parts separately, checking interface dimensions, accuracy, configuration version, seal type and installed equipment scope.

Flotation level-control and valve components
04

Level and Air-Control Components

Level & Air Control

Includes level sensing, control valves, air distribution, flow control and pipe fittings. Confirm instrument ranges, valve specifications, control method and site connections.

Flotation tank, frame and internal supports
06

Tanks, Frames and Internal Supports

Tank, Frame & Internals

Includes tank sections, upper frames, support beams, platforms and internal connections. Verify against general arrangements, loads, interfaces, corrosion exposure and site installation conditions.

For a quotation, provide cell volume, serial number, mixing-mechanism version, drive power, part position, drawing reference or used-part dimensions. The equipment name alone is insufficient.

What information is needed to quote TankCell or OK Cell spares?

Provide the series, effective volume or full model, serial number, mixing-mechanism version, drawing or part number, position, current-part photographs, material and duty.

Is TankCell volume alone enough to manufacture a rotor or stator?

No. Cells of the same volume can differ in mixing-mechanism generation, shaft interfaces, stator base, covering materials and drawing revision. These require verification before manufacture.

How are materials for flotation wear parts confirmed?

Select rubber, polyurethane, ceramic, polyethylene or metal-based designs using part position, slurry chemistry, solids concentration, particle size, speed and failure mode together with the original drawing.

Send the Metso Flotation Model or Drawings

Provide the full model, serial number, nameplate, position, current-part photographs, drawings, material and duty. These support part identification, material assessment, production at certified foundries, quality control and finished-part delivery.

Send التفاصيل for a Quotation

رقم الهاتف: +86 156 3797 3199
zzx@anranst.com

خدمات صنع في الصين

من التقييم الفني إلى تسليم المنتج بالكامل

توفر شركة ANRANST للعملاء العالميين تقييمات هندسية، واختيار التصنيع الصيني، ومراقبة الجودة، وتسليم الأجزاء النهائية لقطع الغيار الصناعية المقاومة للتآكل حسب الطلب، ويمكنها أيضًا دعم قطع الغيار الصناعية الأخرى حسب الطلب.

01

مراجعة الرسومات والهندسة

قم بمراجعة أسطح التزاوج وأبعاد الواجهة، وقم بتقييم جدوى المواد والمعالجة الحرارية والتصنيع.

02

تحديد المادة والمعالجة الحرارية

تُحدَّد درجات المواد وعمليات المعالجة الحرارية لكل طلب على حدة، وتُثبَّت في الاتفاقية الفنية وتُتابَع أثناء الإنتاج.

03

ضبط الجودة

يشمل ذلك تأكيد الرسم، ومراقبة المواد والعمليات، وتتبع الإنتاج، وتنسيق عمليات الفحص والقبول.

04

تسليم المنتج النهائي

تنظيم عمليات التصنيع والتحقق من الجودة والتعبئة والتغليف وتسليم المنتجات النهائية الكاملة لتشكيل حلقة إمداد قابلة للتنفيذ.

قم بتزويدنا بالنماذج الحالية، والرسومات، وأرقام الرسومات، وأرقام الأجزاء، والمواد، أو معلومات ظروف التشغيل، وسنقوم بتحديد التحقق الفني ومسار التوريد وفقًا لذلك.

إرسال طلب