METSO · Part Details

Drive Shaft Bushing

Countershaft Bushing

Identify parts for Metso cone crushers, check models and drawing, confirm materials and processes, and submit an inquiry.

Equipment and Applicable Models

Identify the installed machine model and key dimensions, then check the drawing revision and physical interfaces.

Equipment Series

Metso Cone Crushers

Models and Key Dimensions

Metso HP Series (HP100-HP800), GP Series (GP100-GP550) and MP Series

Materials and Processes

Select the material grade and heat treatment for the operating conditions, processed material and equipment specifications. The options below are commonly used; confirm the final grade against the drawing and technical agreement.

C95400 aluminum bronze (ASTM B148)

Aluminum bronze sand casting; verify composition, as-cast or heat-treated condition and mechanical properties against ASTM B148 and the drawing.

C93200 leaded tin bronze (SAE 660)

Leaded tin bronze bearing material; verify composition and properties against the applicable standard and supply condition, and maintain the lubrication specified by the equipment design.

C54400 Phosphor Bronze

Wrought leaded phosphor bronze; verify properties and load requirements against the product form, supply condition and drawing.

Wear Characteristics and Replacement

Common wear modes and maintenance advice. The actual replacement interval depends on duty, material and operating data.

Common wear modes

  • Gear mesh forces cause uneven bushing wear, with one side wearing faster than the other.
  • Inadequate lubrication causes direct metal contact between the bushing and journal, producing heat and seizure.
  • Extended operation enlarges the bushing bore and gear mesh clearance, increasing noise and vibration.
  • Contaminated lubricant causes scoring on the bushing surface.
Replacement criteria

Check bushing bore wear and clearance against the maintenance limits for the model. Inspect the bushing if abnormal gear noise persists after adjustment, and replace it if seizure marks or extensive scoring are present. Check the gear tooth contact pattern after replacement.

Material and Process Control

Materials, heat treatment, composite processes and inspection follow the specific drawing, duty and technical review.

Material Grade / Substrate

C95400 aluminum bronze (ASTM B148), C93200 leaded tin bronze (SAE 660), or C54400 phosphor bronze

Heat Treatment Condition

Follow the applicable standard for the material grade; confirm heat treatment and hardness requirements against the drawing

Composite / Hardfacing Requirements

Bronze bushings are not suitable for weld overlay repair. Replace the worn bushing as a complete part; surface repair is not recommended.

Dimensions and Inspection

Manufacture to drawings produced from part measurements or supplied by the customer. Critical mating surface tolerances follow OEM requirements. Use UT/MT inspection to assess castings for shrinkage porosity and cracks against the agreed acceptance criteria.

Parts with the same name may not be interchangeable across models, drawing revisions, interfaces and materials. Confirm the full model, serial number and drawings before manufacture.

Send Your Wear Part Requirements

Provide the equipment model, drawing for engineering review and quotation. If service life or wear is a concern, describe the operating conditions as well.

Equipment Brand and ModelDrawingDrawing or DimensionsCurrent MaterialPhotographs of Failed PartsTarget Service LifeOperating Conditions
Request a Quote

Or contact us directly: +86 156 3797 3199
zzx@anranst.com

Manufacturing Services in China

From Technical Assessment to Finished-Part Delivery

ANRANST provides customers worldwide with engineering assessment, production at certified foundries to the customer technical requirements, quality control and finished-part delivery for custom wear parts and industrial spares, with scope to support other custom industrial parts.

01

Drawing and Engineering Review

We review mating surfaces and interface dimensions and assess material, heat treatment and manufacturing feasibility.

02

Material and Heat-Treatment Specification

Material grades and heat-treatment processes are specified order by order, stated in the technical agreement and tracked through production.

03

Quality Control

Drawing confirmation, material and process control, production tracking, inspection and acceptance coordination.

04

Finished-Part Delivery

We coordinate manufacturing, quality confirmation, packaging and delivery of complete finished parts in a workable, closed-loop supply process.

Provide the equipment brand, complete model and serial number, part name, part number or drawing number, drawing revision, quantity, material requirements and duty. If identifiers are unavailable, send photographs and key dimensions.

Submit an Enquiry