METSO · Part Details

SAG Mill Liner and Lifter System

SAG Mill Liner and Pulp Lifter System

Identify parts for Metso SAG mills, check machine models and drawing references, review material and manufacturing requirements, and prepare an inquiry.

Key Parts Covered

This page identifies installation positions that share the same wear-resistant material and manufacturing process requirements.

Feed Throat Liner

Throat Liner

Feed-End Inner Liner

Inner Head Liner

Feed-End Outer Liner

Outer Feed Head Liner

Shell Lifter Plate

Shell Lifter Plate

Discharge Grate

Discharge Grate

Intermediate Discharge Liner

Middle Liner

Outer Pulp Lifter

Outer Pulp Lifter

Inner Pulp Lifter

Inner Pulp Lifter

Discharge Cone

Discharge Cone

Filler Ring

Filler Ring

Materials and Processes

Select the material grade and heat treatment for the operating conditions, processed material and equipment specifications. The options below are commonly used; confirm the final grade against the drawing and technical agreement.

Confirm against the OEM specification

Select materials to suit OEM specifications and operating conditions; confirm the final grade and heat treatment against the drawing.

Wear and Replacement Criteria

Common wear patterns and maintenance guidance are outlined below. Determine replacement intervals from operating conditions, processed material and equipment performance data.

Common Wear Patterns

  • Material impact and sliding abrasion reduce surface thickness
  • Localized impact causes dents and plastic deformation
  • Prolonged wear exposes the base metal
  • Wear around bolt fixing points causes the liner to loosen
Replacement Criteria

Assess replacement against the remaining-thickness limits in the equipment manual and drawings. Stop the equipment for inspection and corrective action if through-cracks or fastening failures occur.

Equipment, Models and Drawing References

Identify the installed machine model and key dimensions, then check the part number, drawing number, drawing revision and physical interfaces.

Equipment Series

Metso SAG Mills

Models and Key Dimensions

Metso SAG Mill Range

Drawing Number / Part Number

Provide Your OEM Part Number

Drawing Revision

Confirm dimensions by measuring the sample or using the customer drawing. Cross-check the drawing revision against the model on the equipment nameplate.

Materials and Process Control

Materials, heat treatment, composite construction and inspection requirements depend on the specific drawing, operating conditions and technical review.

Material Grade / Substrate

Confirm against the OEM specification

Heat Treatment Condition

Follow the applicable standard for the material grade; confirm heat treatment and hardness requirements against the drawing

Composite / Hardfacing Requirements

Follow OEM design requirements; confirm any hardfacing or composite construction against the drawing

Dimensions and Inspection

Inspect key dimensions against the drawing for the OEM part number. Check mounting and sealing surfaces individually and perform UT/MT non-destructive testing on castings.

Parts with the same name may not be interchangeable because of differences in machine model, drawing revision, mounting interface or material specification. Use the complete model, serial number, drawing number and drawing before manufacture.

Manufacturing Services in China

From Technical Assessment to Finished-Part Delivery

ANRANST provides customers worldwide with engineering assessment, production at certified foundries to drawing, quality control and finished-part delivery for custom wear parts and industrial spares, with scope to support other custom industrial parts.

01

Drawing and Engineering Review

We review mating surfaces and interface dimensions and assess material, heat treatment and manufacturing feasibility.

02

Material and Heat-Treatment Specification

Material grades and heat-treatment processes are specified order by order, confirmed in the technical agreement and tracked through production.

03

Quality Control

Drawing confirmation, material and process control, production tracking, inspection and acceptance coordination.

04

Finished-Part Delivery

We coordinate manufacturing, quality confirmation, packaging and delivery of complete finished parts in a workable, closed-loop supply process.

Provide the existing model, drawings, drawing or part numbers, materials or operating conditions so we can identify the appropriate technical review and supply route.

Submit an Enquiry