What other names or designations is the Self-propelled Drill rig known by?
The Self-propelled Drill rig is also documented under these designations: Kopeysk SBU-250 self-propelled drilling rig, СБУ-250, СБУ-250М.
Self-propelled drilling rig · 2026-10-01 · 1 model


Select a model to jump to its component table; former and renamed designations are listed under “Historical names / renamings”.
| Model | Historical names / renamings | Period | Components |
|---|---|---|---|
| Kopeysk SBU-250 self-propelled drilling rig | СБУ-250; СБУ-250М | 2026-10-01 | 8 |
The numbers on the diagram correspond one to one with the rows below.
| No. | Component | Location | Applies to |
|---|---|---|---|
| 1 | Drilling assembly | Vertical drilling guide at front | СБУ-250М |
| 1 | Drill assembly | Vertical drilling assembly at right | СБУ-250 (website image) |
| 2 | Crawler running gear | Beneath the body | СБУ-250М |
| 2 | Crawler running gear | Visible crawler beneath drill body; excludes trailer wheels | СБУ-250 (website image) |
| Component |
|---|
| Automatic control device (ILMA supply scope) |
| SBU250 crawler chassis (2003 test machine) |
| SBU250 drilling unit (improved test batch) |
| SBU250 two-speed motor (improved test batch) |
| SBU250 remote console (improved test batch) |
| SBU250 lifting manipulator (improved test batch) |
| SBU250 hydraulic drive reducer (improved test batch) |
| SBU250 drilling tool kit category (500mm hole in 2010) |
Models with the same components are grouped together; select a group to open its component table.
| Component | Location |
|---|---|
| Automatic control device (ILMA supply scope) | Self-propelled drilling rig СБУ-250 control, assembly position not listed |
| SBU250 crawler chassis (2003 test machine) | Crawler walking of the two earliest test machines |
| SBU250 drilling unit (improved test batch) | Drilling unit carried by robot |
| SBU250 two-speed motor (improved test batch) | In the drilling unit; remote control button switches the shaft speed |
| SBU250 remote console (improved test batch) | Switch the rotation speed and control the drilling action |
| SBU250 lifting manipulator (improved test batch) | Lift drilling unit for drilling at different heights |
| SBU250 hydraulic drive reducer (improved test batch) | Rotate the drilling unit 360° to drill fan-shaped holes at the top and bottom of the roof |
| SBU250 drilling tool kit category (500mm hole in 2010) | 500mm drilling; specific members/number not specified |
The Self-propelled Drill rig is also documented under these designations: Kopeysk SBU-250 self-propelled drilling rig, СБУ-250, СБУ-250М.
The Self-propelled Drill rig is listed under the Kopeysk brand as: Self-propelled drilling rig. Period: 2026-10-01. Status: Listed in the manufacturer's current catalogue.
8 components are recorded, including: Automatic control device (ILMA supply scope), SBU250 crawler chassis (2003 test machine), SBU250 drilling unit (improved test batch), SBU250 two-speed motor (improved test batch), SBU250 remote console (improved test batch), SBU250 lifting manipulator (improved test batch), SBU250 hydraulic drive reducer (improved test batch), SBU250 drilling tool kit category (500mm hole in 2010). The full list with locations is in the components table on this page.
Send us a drawing or sample and tell us the equipment model and part name.
Provide the equipment model, drawing for engineering review and quotation. If service life or wear is a concern, describe the operating conditions as well.
Or contact us directly: +86 156 3797 3199
zzx@anranst.com
ANRANST provides customers worldwide with engineering assessment, production at certified foundries to the customer technical requirements, quality control and finished-part delivery for custom wear parts and industrial spares, with scope to support other custom industrial parts.
We review mating surfaces and interface dimensions and assess material, heat treatment and manufacturing feasibility.
Material grades and heat-treatment processes are specified order by order, stated in the technical agreement and tracked through production.
Drawing confirmation, material and process control, production tracking, inspection and acceptance coordination.
We coordinate manufacturing, quality confirmation, packaging and delivery of complete finished parts in a workable, closed-loop supply process.
Provide the existing model, drawings, drawing, materials or operating conditions so we can identify the appropriate technical review and supply route.
Submit an Enquiry