Water Intake

2018 · 1 model

Elgin Water Intake
Elgin Water Intake (2)
Pictured model: OEM pictured configuration (exact model not specified)
Elgin
ElginBrand
2018Period
Historical modelStatus
Elgin

Models and Historical Names in This Series

Select a model to jump to its component table; former and renamed designations are listed under “Historical names / renamings”.

ModelPeriodComponents
Elgin Coanda Screen20183
Elgin

Numbered Components

The numbers on the diagram correspond one to one with the rows below.

No.ComponentLocationApplies to
1Approach / acceleration plateOriginal 1: upstream approach plateOEM pictured configuration (exact model not specified)
2Wedge-wire screen panelOriginal 2: downstream curved wedge-wire panelOEM pictured configuration (exact model not specified)
3Mounting angleOriginal 3: screen mounting anglesOEM pictured configuration (exact model not specified)
Other Components · 1 item
Component
Guard bar
Elgin

Components by Model

Models with the same components are grouped together; select a group to open its component table.

Elgin Coanda Screen3 items
No.ComponentLocation
1Flow guiding acceleration plateAcceleration section upstream of the screen surface
2Wedge wire screen panelIntake screening working surface
Protective stripAnti-collision position in front of the screen surface

Frequently asked questions

What other names or designations is the Water Intake known by?

The Water Intake is also documented under these designations: Elgin Coanda Screen.

Which brand and type of equipment is the Water Intake?

The Water Intake is listed under the Elgin brand. Period: 2018. Status: Historical model.

Which components and wear parts are recorded for the Water Intake?

3 components are recorded, including: Flow guiding acceleration plate, Wedge wire screen panel, Protective strip. The full list with locations is in the components table on this page.

Which model-specific components of the Water Intake have their own page?

Model-specific components with their own page: Flow guiding acceleration plate, Wedge wire screen panel, Protective strip (3 in total).

How do I enquire about parts for the Water Intake?

Send us a drawing or sample and tell us the equipment model and part name.

Send us a drawing or sample and tell us the equipment model and part name

Provide the equipment model, drawing for engineering review and quotation. If service life or wear is a concern, describe the operating conditions as well.

Equipment Brand and ModelDrawingDrawing or DimensionsCurrent MaterialPhotographs of Failed PartsTarget Service LifeOperating Conditions
Request a Quote

Or contact us directly: +86 156 3797 3199
zzx@anranst.com

Manufacturing Services in China

From Technical Assessment to Finished-Part Delivery

ANRANST provides customers worldwide with engineering assessment, production at certified foundries to the customer technical requirements, quality control and finished-part delivery for custom wear parts and industrial spares, with scope to support other custom industrial parts.

01

Drawing and Engineering Review

We review mating surfaces and interface dimensions and assess material, heat treatment and manufacturing feasibility.

02

Material and Heat-Treatment Specification

Material grades and heat-treatment processes are specified order by order, stated in the technical agreement and tracked through production.

03

Quality Control

Drawing confirmation, material and process control, production tracking, inspection and acceptance coordination.

04

Finished-Part Delivery

We coordinate manufacturing, quality confirmation, packaging and delivery of complete finished parts in a workable, closed-loop supply process.

Provide the existing model, drawings, drawing, materials or operating conditions so we can identify the appropriate technical review and supply route.

Submit an Enquiry