Outokumpu

2004 · 1 model

Outokumpu
Outokumpu
OutokumpuBrand
2004Period
Historical modelStatus
Outokumpu

Models and Historical Names in This Series

Select a model to jump to its component table; former and renamed designations are listed under “Historical names / renamings”.

ModelPeriodComponents
Hoesch2004
Outokumpu

Numbered Components

The numbers on the diagram correspond one to one with the rows below.

No.ComponentLocationApplies to
1Filter plate packPlate pack visible through the right-hand openingLarox FP (2021 pictured configuration)
2Safety enclosure doorWindowed safety door on the right sideLarox FP (2021 pictured configuration)
3Filter press frameContinuous load-carrying beam above the plate packLarox FP (2021 pictured configuration)

Frequently asked questions

What other names or designations is the Outokumpu known by?

The Outokumpu is also documented under these designations: Hoesch.

Which brand and type of equipment is the Outokumpu?

The Outokumpu is listed under the Outokumpu brand. Period: 2004. Status: Historical model.

How do I enquire about parts for the Outokumpu?

Send us a drawing or sample and tell us the equipment model and part name.

Send us a drawing or sample and tell us the equipment model and part name

Provide the equipment model, drawing for engineering review and quotation. If service life or wear is a concern, describe the operating conditions as well.

Equipment Brand and ModelDrawingDrawing or DimensionsCurrent MaterialPhotographs of Failed PartsTarget Service LifeOperating Conditions
Request a Quote

Or contact us directly: +86 156 3797 3199
zzx@anranst.com

Manufacturing Services in China

From Technical Assessment to Finished-Part Delivery

ANRANST provides customers worldwide with engineering assessment, production at certified foundries to the customer technical requirements, quality control and finished-part delivery for custom wear parts and industrial spares, with scope to support other custom industrial parts.

01

Drawing and Engineering Review

We review mating surfaces and interface dimensions and assess material, heat treatment and manufacturing feasibility.

02

Material and Heat-Treatment Specification

Material grades and heat-treatment processes are specified order by order, stated in the technical agreement and tracked through production.

03

Quality Control

Drawing confirmation, material and process control, production tracking, inspection and acceptance coordination.

04

Finished-Part Delivery

We coordinate manufacturing, quality confirmation, packaging and delivery of complete finished parts in a workable, closed-loop supply process.

Provide the existing model, drawings, drawing, materials or operating conditions so we can identify the appropriate technical review and supply route.

Submit an Enquiry