Which models does the TM cover?
The TM covers 2 models: Ciber TM 303020P, Ciber TM 4020P. Former and renamed designations are listed in the models table on this page.
2026-10-03 · 2 models


Select a model to jump to its component table; former and renamed designations are listed under “Historical names / renamings”.
| Model | Period | Components |
|---|---|---|
| Ciber TM 303020P | 2026-10-03 | 3 |
| Ciber TM 4020P | 2026-10-03 | 3 |
The numbers on the diagram correspond one to one with the rows below.
| No. | Component | Location | Applies to |
|---|---|---|---|
| 1 | Tank shell | Visible cylindrical tank body | TM4020P |
| Component |
|---|
| Bitumen transfer pipe |
| Bitumen transfer pump |
| Thermal oil pipe |
Models with the same components are grouped together; select a group to open its component table.
Models: Ciber TM 303020P, Ciber TM 4020P
| Component |
|---|
| Model-specific component |
| Model-specific component |
| Model-specific component |
The TM covers 2 models: Ciber TM 303020P, Ciber TM 4020P. Former and renamed designations are listed in the models table on this page.
The TM is also documented under these designations: Ciber TM 303020P, Ciber TM 4020P.
The TM is listed under the Ciber brand. Period: 2026-10-03. Status: Historical model.
Send us a drawing or sample and tell us the equipment model and part name.
Provide the equipment model, drawing for engineering review and quotation. If service life or wear is a concern, describe the operating conditions as well.
Or contact us directly: +86 156 3797 3199
zzx@anranst.com
ANRANST provides customers worldwide with engineering assessment, production at certified foundries to the customer technical requirements, quality control and finished-part delivery for custom wear parts and industrial spares, with scope to support other custom industrial parts.
We review mating surfaces and interface dimensions and assess material, heat treatment and manufacturing feasibility.
Material grades and heat-treatment processes are specified order by order, stated in the technical agreement and tracked through production.
Drawing confirmation, material and process control, production tracking, inspection and acceptance coordination.
We coordinate manufacturing, quality confirmation, packaging and delivery of complete finished parts in a workable, closed-loop supply process.
Provide the existing model, drawings, drawing, materials or operating conditions so we can identify the appropriate technical review and supply route.
Submit an Enquiry