TOWER MILL / STIRRED MILL · PART IDENTIFICATION

Tower Mill / Stirred Mill Tower Mill Screw Assembly

tower mill / stirred mill part-identification and RFQ route

A purchasing and technical-confirmation route for a complete tower-mill screw assembly, defined by the submitted assembly drawing and bill of materials. This assembly route is separate from individual impeller or agitator components, screw-flight tips, liners and other replaceable wear parts. A shared name or visually similar mill does not establish compatibility.

Information needed before manufacture

Confirm the installed mill and define the complete assembly boundary before quotation. Do not assume that the shaft, hub, flights, wear liners, fasteners, balancing, coating or site assembly are included unless the approved assembly drawing and bill of materials state that scope.

Check 1

Installed mill, full model, serial number and assembly position

Check 2

Assembly drawing, bill of materials, revision and required delivery boundary

Check 3

Interfaces, rotation, balance, operating duty and acceptance requirements

Material and manufacturing review

Material, heat treatment, fabrication, machining, balancing, inspection and acceptance requirements are reviewed item by item from the submitted assembly drawing, bill of materials and operating duty. No unverified assembly composition or fixed material system is published here.

Drawing control

Use the current assembly drawing, bill of materials, revisions and interface record.

Duty record

Include slurry or ore conditions, load, speed, rotation, wear record and failure mode.

Acceptance record

Confirm fabrication, machining, balance, fit-up, inspection and project-specific acceptance requirements.

Draft status: the purchasing route is complete, while the exact assembly composition remains controlled by gap C01. The page remains noindex until an approved assembly scope can be published.